Project and Over-Dimensional Cargo (ODC) logistics in India is a specialist discipline where a single miscalculated axle load or missing permit can freeze a multi-crore project for weeks. This guide covers how oversized, heavy-lift, time-critical shipments actually move — from berth to installation site — using Mudra Port and MRS Supply Chain as the working example.
Project cargo is the coordinated movement of multiple heavy, interdependent units tied to one industrial project; ODC is any shipment exceeding standard limits for length, width, height or weight. Both need specialised handling, permits and route planning that ordinary freight networks can't provide.
Two things make this cargo unforgiving. It defies standard formats — a network built for uniform boxes can't flex around a 40-metre unit that outweighs a locomotive. And it's time-critical: late project cargo doesn't just sit in a warehouse, it idles installation crews and pushes back commissioning. The cost shows up fast — berth bottlenecks, safety incidents, and cascading delays when inland roads or bridges can't take the axle weight.
Mundra is engineered for project cargo — deep-water access, no vessel-length limit, 100-tonne cranes and staging land let oversized loads be received and moved without improvised workarounds. Its inland rail and road capacity is deliberately built to exceed marine intake, so heavy cargo doesn't pile up on the quay.
| Capability | Specification |
|---|---|
| Draft | Up to 19 m — berths the largest carriers directly |
| Berths | 26 multi-purpose; no Length Overall restriction |
| Mobile harbour cranes | 100 MT safe working load (Gottwald / Liebherr) |
| Steel yard | 1,20,000 m², 8 Goliath cranes, vacuum-lift |
| Rail-Over-Bridge | 100 MT dynamic wheel load (India's first private 4-lane) |
| Private rail | 117 km double-track, up to 130 trains/day |
Project cargo often moves alongside hazardous materials, so the operation must meet both heavy-lift engineering and India's hazardous-goods rules — anchored in the Manufacture, Storage and Import of Hazardous Chemical (MSIHC) Rules, 1989.
In practice that means:
For ODC road movement, it also means the right over-dimensional permits permits from state transport authorities, a route survey to confirm bridge and clearance limits, and movement on multi-axle hydraulic trailers or SPMTs that keep weight within legal axle limits.
The last mile is where project cargo most often goes dark — so tamper-evident, real-time tracking is now a core capability, not an add-on. Modern operations run a Transport Management System giving the importer, transporter and site team one live picture.
In Kutch, MRS Supply chain has integrated RFID and blockchain into cargo tracking to eliminate transit blind spots and "ghost inventory," so every party sees the same verified movement history.
Established in 2016 with regulatory expertise built into the workflow, MRS holds certified credentials for Haz, Non-Haz, ODC and heavy-lift cargo.
Two things set the operation apart:
Project cargo is a strategic discipline, not a commodity service. The importers who choose the right gateway and partner early de-risk their timelines instead of firefighting them.
Any shipment that exceeds standard limits for length, width, height or weight and can't move on a normal trailer or in a standard container — requiring specialised handling, permits and route planning.
It offers up to 19 m draft, 26 berths with no Length Overall restriction, 100 MT mobile harbour cranes, a dedicated steel yard, and inland rail/road capacity built to exceed marine intake.
The Manufacture, Storage and Import of Hazardous Chemical Rules, 1989 — covering isolation distance, containment, fire-resistant construction and explosion-proof equipment.